What is the expected duration of the project?(b) What is the project variance?

The following represents a project with known activity times. All times are in weeks.ActivityImmediatePredecessorTimeA–4B–3CA2DB7EC, D4FB5GE, F4Determine the critical path, completion time, and slack for this project.2. Consider the project with the following estimates for activity times and precedence relationships:ActivityOptimisticTimeMostLikely TimePessimisticTimeImmediatePredecessor(s)A345—B579—C2310AD258BE177BF357C, DG789D, EH2610F(a) What is the expected duration of the project?(b) What is the project variance?(c) If the deadline of the project is 25 days, what is the probability of finishing the project on time?3)A furniture company is producing two types of furniture. Product A requires 8 board feet of wood and 2 lbs. of wicker. Product B requires 6 board feet of wood and 6 lbs. of wicker. There are 2000 board feet of wood available for product and 1000 lbs. of wicker. Product A earns a profit margin of $30 a unit and Product B earns a profit margin of $40 a unit. Formulate the problem as a linear program and solve it.The following represents a project with known activity times. All times are in weeks.ActivityImmediatePredecessorTimeA–4B–3CA2DB7EC, D4FB5GE, F4Determine the critical path, completion time, and slack for this project.2. Consider the project with the following estimates for activity times and precedence relationships:ActivityOptimisticTimeMostLikely TimePessimisticTimeImmediatePredecessor(s)A345—B579—C2310AD258BE177BF357C, DG789D, EH2610F(a) What is the expected duration of the project?(b) What is the project variance?(c) If the deadline of the project is 25 days, what is the probability of finishing the project on time?3)A furniture company is producing two types of furniture. Product A requires 8 board feet of wood and 2 lbs. of wicker. Product B requires 6 board feet of wood and 6 lbs. of wicker. There are 2000 board feet of wood available for product and 1000 lbs. of wicker. Product A earns a profit margin of $30 a unit and Product B earns a profit margin of $40 a unit. Formulate the problem as a linear program and solve it.


 

. .

.

The post What is the expected duration of the project?(b) What is the project variance? appeared first on Perfect Nursing Tutors.

 

"Place this order or a similar order with Perfect Nursing Tutors and get an amazing discount"

Testimonials

James USA
James USACambridge University
“After I ordered a dissertation from your writing service, the first paper that I was given did not met my professor’s demand. I set the paper on revision and the writer made the revision for free meeting all my requirements and I was very satisfied. My teacher also approved my work. I would recommend students
David UK
David UKBriston
“After attending my brother’s wedding, I had only very little time to complete my paper. I was so worried because I knew that I could not bit the deadline. However, I was shocked by how your writers managed to deliver my paper on time, and I was among the best in our class in that paper. Thank you so much and I will never hesitate to use your